John Rogers Elementary School Replacement Project

Latest News

Live Video

Project Update: January 2025

  • Started installing the gymnasium floor.
  • Continued painting, casework (cabinetry) installation, ceiling tile installation.
  • Continued roofing installation, site utilities, and hardscape installation.

About the Project

The existing school building will be demolished, and a new school building will be constructed. Site work will terrace the site and seamlessly connect the play field to the rest of the campus.

Designed for current and future students

The proposed design replaces the existing John Rogers Elementary School with a new, 82,000 square foot 2- and 3-story building. Once complete, the school will provide an equitable learning space for up to 500 K-5 elementary students and an area to expand the school in the future as enrollment grows.

Thanks to the work of the School Design Advisory Team (SDAT) — comprised of school leaders, parents, and community members — it will meet district educational standards for 500 students while also fulfilling the specific needs the specific needs of the John Rogers Elementary School community.

The school will nestle into a newly terraced site that will enhance connections to nature, play, and outdoor learning. Campus improvements will provide a safe site for all. A new network of pathways and street access will connect the neighborhood to the school.

Outdoor learning areas will be improved, including a new natural turf field and drainage system. Natural play areas will connect students to the site.

Safety and security

Visitors will enter through a secure main entrance that invites you into the administrative office for check-in before entering the school. All other doors will be locked during the school day.

Building for a sustainable future

The new John Rogers Elementary is being designed as Seattle Public Schools’ first Net-Zero Energy building, and includes:

  • Daylight in all classrooms and learning spaces
  • Highly efficient heating and fresh air ventilation
  • Geothermal wells to use energy from the ground for heating and cooling
  • Solar panels to use energy from the sun

Timeline

construction phase graphic showing that the school is in the Construction phase
Learn what happens during these project phases
  • Pre-design phase complete
  • Schematic design phase complete
  • Design development phase complete
  • Construction documents and permitting phase complete
  • Bid and award phase complete
  • Construction is in progress
  • School opens Fall 2025

Construction Progress Photos

a view of a large building with two wings under construction
Looking toward the south entry – Dec. 2024
looking down between two wings of an unfinished building to where some planters are installed
Central courtyard – Dec. 2024
a part of a 3-story building with brown siding and windows
Metal siding on south side – Dec. 2024
a patio under cover outside of large windows
Library patio roof complete – Dec. 2024
inside room with bare drywall taped on one side and painted drywall on the other. there is a manlift and a clerstory window
Painting in progress in the commons – Dec. 2024
a partially completed staircase
Installing drywall in stairs – Dec. 2024
a large room with an arch divider, windows, and cabinetry
Ceiling tiles installed in classroom – Dec. 2024
aerial of a large building under construction with a green field to the right and a lake in background
Looking southeast in November 2024
a sink and cabinets with a tile backsplash
Tile installation at a classroom sink – Nov. 2024
aerial of a building under construction
Looking toward the southeast entry – Nov. 2024
part of a hallway with a window and door leading into a classroom space
Hallway wainscot outside of classroom – Nov. 2024
a large room with full height windows under construction with stacks of materials
Window installation in library – Nov. 2024
a large room with high ceilings has equipment for construction
Gym paint and equipment installation – Nov. 2024
aerial of a building under construction with a square dirt field to the right
Aerial view in October 2024
aerial of a building under construction with site equipment
Looking toward the Southeast entry – Oct. 2024
an arched doorway and shelving with a laser level line
Installing casework – Oct. 2024
a large 3-story space with exposed wall studs and a stairway
Commons wallboard installation in progress – Oct. 2024
a courtyard space between two wings of a building under construction
Future location of building courtyard – Sep. 2024
a large building under construction with a field of soil in front
looking toward the south entrance – Sep. 2024
a person working with a shovel next to concrete stairs
Installing stairs at the play field – Sep. 2024
a small room with an arched doorway is painted green
Learning commons painting in progress – Sep. 2024
a hallway under construction with the ceiling open showing wiring and ducting
Wiring in progress – Sep. 2024
a construction site has a sloped dirt area that is next to a grass area. a back hoe and a bulldozer are in the photo
Trenching for geothermal wells on the south part of the site – Oct. 2023
a building under construction with scaffolding and bricks on some of the walls
Brick facing in progress – Aug. 2024
a building under construction with materials on the floor and high ceiling
Metal stud framing and utilities in the gymnasium – Aug. 2024
interior of a building under construction with materials on the ground floor and stairs leading up
Framing for the commons – Aug. 2024
a partially finished room under construction with a person working on wallboard
Drywall in a classroom – Aug. 2024
a building under construction with trees in the background
Looking south toward the future field – Aug. 2024
a building under construction with a lot of construction equipment and materials
Looking north with the south entrance to the lower left – Aug. 2024
aerial view of a construction project with a large H-shaped building in progress. Behind it is a open dirt area with construction equipment. Trees are all around and a lake is visible in the far background.
Aerial view looking southeast in June 2024
a large building under construction with a 3 story section covered in yellow material with writing and a section that has a sloped roof
South entrance and one of the classroom wings – June 2024
looking out through a wall framing without walls toward another building that has yellow sheathing on it
Exterior framing and sheathing – June 2024
inside a partially constructed hallway with metal studs and people working
Metal stud framing – June 2024
wood framing on a concrete floor inside a partially constructed building
Form work for the landing for the commons stairs – June 2024
inside a partially built room with wood beams and steel framing
Interior view of the library – June 2024
aerial view of a large building under construction with roofs in place in two areas and framing on others
Looking north toward the future south entrance – May 2024
a large dirt lot with some mounds and construction grading machines
Work underway in the location of the future playfield – May 2024
a crane line is being attached to a white steel beam with red and blue stripes. there is a US flag and an evergreen tree attached to the top of the beam
Preparing to lift the final beam into place – May 2024
a steel beam frame has two people shaking hands on a white beam with red and blue paint and an evergreen tree and a flag on it
Celebrating installation of the final steel beam at the Topping Out Ceremony – May 2024
inside a partially built building with steel framing for walls being installed on a concrete floor
Interior metal studs and door frame installation – May 2024
aerial of a large construction project with a crane, equipment, and mud. there is a lake in the distance
Aerial view looking southeast toward Lake Washington – Apr. 2024
aerial of a building under construction with foundations for other parts surrounding it
Administration and the south learning wing taking shape – Apr. 2024
steel framing for a large building and some ground work in front of it
Steel erection in progress – Apr. 2024
a large muddy area with a retaining pond sits behind a gravel area with a construction machine
Grading and compating for the lower playfield – Apr. 2024
Steel structure of columns and beams under construction
Installing steel columns, joists, and decking in the south educational wing – Mar. 2024
aerial view from the side showing a large construction site iwth steel being erected at one end and trucks and equipment at the other end
Looking northwest with school structural steel in the upper right – Mar. 2024
aerial of part of a construction site with foundations outlining the building footprint and some structural steel erected
Primary building footprint with steel going up on south end – Mar. 2024
aerial of part of a large construction site with concrete footings showing where the building will be
Primary building footprint and temporary water retention pond – Feb. 2023
aerial view of a large construction site with equipment and trucks. there is a body of water in the background and houses in the foreground
Looking southeast – February 2024
aerial view of a construction site surrounded by trees and houses
Aerial view looking southwest with white structural foam placed – Dec. 2023
a dirt construction site with trenches and construction materials
Preparing for concrete footing installation – Dec. 2023
aerial view of a large construction site that has mud, grass, and equipment
Looking northwest the new building will be in the upper part of the photo – Oct. 2023

Current Designs

Site plan

architect's rendering of a site plan with a building in the center, a large green field to the right, and a circular driveway to the left
Architect’s drawing of the site plan for the new school building and grounds – June 2023
architect's drawing of a building with a walkway and plantings
Potential view of the south entrance
architect's drawing of an exterior courtyard
Potential view of the courtyard
architect's drawing of a large interior space with stairs going up
Potential view of the commons
a site plan drawing with a school footprint and a field
Potential site plan

Here is the presentation from the meeting.

Questions and Answers from Community Meetings

Below you will find the questions/comments and answers from community meetings

School Design Advisory Team (SDAT)

Early in the design process, representatives from the school community come together to form a school’s SDAT. SDATs typically include school and district staff, parents, and community members. Students are sometimes included for all or part of the process. The project construction managers also take part. Learn more about the John Rogers Elementary School SDAT.

More information

Site size: The 9.1 acre site is partially in the flood plain for Thornton Creek.

Architect: DLR Group

General Contractor/Construction Management Firm (GC/CM): Lydig Construction

Project Budget: $91.5M

Funding Source: Funded by the Building Excellence V (BEX V) Capital Levy, approved by Seattle voters in 2019.

Contact

For questions or comments about this project, please use our online Let’s Talk form.

Project Manager: Amanda Fulford, asfulford1@davidegalliani.com, 206-252-0697